|
ECP TANKER PUMP ROOM FLOODING |
Doc No.: ECP 16-00
Revision: 01 Date: 15 Oct 2024 Issued by: DPA Approved by: MD |
Flooding in a Tanker Pump Room
In case of flooding in a tanker pump room, the primary procedure involves activating the bilge pumps, utilizing emergency suction systems, and ensuring proper ventilation to remove accumulated water and maintain a safe environment.
Here's a more detailed breakdown of the procedures:
1. Immediate Actions & Assessment:
- Alert the Bridge:
Immediately notify the bridge of the flooding situation, including the location and severity. - Assess the Situation:
Determine the source and extent of the flooding, and identify any potential hazards. - Safety First:
Ensure the safety of all personnel in the pump room and evacuate if necessary. - Check Bilge Level Alarms:
Ensure that bilge level alarms are functioning correctly and sounding as expected.
2. Bilge Pumping Procedures:
- Activate Bilge Pumps:
Initiate the operation of the main bilge pumps to remove the water. - Utilize Emergency Bilge Suction:
If the main pumps are insufficient, activate the emergency bilge suction system, which may be located on a central cooling pump. - Ensure Proper Ventilation:
Run the pump room exhaust fans on high speed and consider using portable fans to introduce fresh air into the bilges. - Check Strainers and Valves:
Ensure that all valve, strainer, and pump casing drain plugs are tight. - Interconnected Systems:
Bilge and ballast systems may be interconnected, so consider using ballast pumps to assist in pumping out water.
3. Post-Flooding Procedures:
- Inspect and Repair:
After the flooding is contained, inspect the pump room for any damage and make necessary repairs. - Clean Bilges:
Regularly clean and maintain the pump room bilges to prevent future accumulation of residues. - Periodic Testing:
Ensure that the bilge pumps and emergency systems are regularly tested and maintained.